The head race gate structure footing was undermined during the 2008 flood that occurred over the southern half of Wisconsin. The control gates were no longer functional to place stop logs. This structure was also served as pedestrian crossing in the town…
Tail Race General Construction
The tail race excavation and berm restoration began in earnest during the sweltering heat of July 2012. A persistent drought throughout the summer provided low flow conditions in river systems throughout SE Wisconsin, making the project more managable.…
Trash Rack General Construction
The trash rack structure was the final restoration project completed at the site. The 2008 flood caused considerable damage by dislodging boulders and large rocks into the fore-bay and the flume, as the center mill gate was displaced into the flume by…
Tail Race Berm Construction
The tail race berm restoration benefited by low flow conditions during the 2012 drought. The 2008 record flood cut through the berm at the bridge piers. This project was completed by Cadens, LLC and town employees.
Tail Race Berm before - south view…