The tail race berm restoration benefited by low flow conditions during the 2012 drought. The 2008 record flood cut through the berm at the bridge piers. This project was completed by Cadens, LLC and town employees.
Tail Race Berm before – south view to Main St. bridge.
Tail Race Berm after – south view to Main St. bridge.
Berm after – east view from Main St. bridge.